Weekly Testing

Every week a manual call point should be operated during normal working hours. It should be confirmed that the control equipment is capable of processing a fire alarm signal and providing an output to fire alarm sounders, and to ensure that the fire alarm signal is correctly received at any alarm-receiving centre to which fire alarm signals are transmitted.  It is not necessary to confirm that all fire alarm sounder circuits operate correctly at the time of this test

The weekly test should be carried out at approximately the same time each week; instructions to occupant’s should then be that they should report any instance of poor audibility of the fire alarm signal. In systems with staged alarms incorporating an “Alert” and an “Evacuate” signal, the two signals should be operated, where practicable, sequentially in the order they would occur at the time of a fire (i.e. “Alert” then “Evacuate”)

A different manual call point should be used at the time of every weekly test, so that all manual call points in the building are tested in rotation over a prolonged period. There is no maximum limit for this period (e.g in a system with 150 manual call points, the user will test each manual call point every 150 weeks). The result of the weekly test and the identity of the manual call points used should be recorded in the system log book. 

We can provide this weekly testing for you through a planned weekly testing maintenance contract

Contact us for a free no-obligation quote